New Administrative Capital (SS2, SS3) 220/22/22 KV GIS Substation

Client

Army Engineering Authority

Location

New Administrative Capital

Duration

12 months

Year

2018

Scope of Work

EPC

The project includes:

  • 220 KV GIS.
  • 220/22/22 KV, 2 X 175 MVA Power Transformers.
  • Outdoor Equipment For 220/22/22 KV Transformers.
  • 22KV Switchgear.
  • Control, Protection, Metering & Measuring System.
  • AC/DC Auxiliary Systems.
  • 9 MVAR Capacitor Banks.
  • Civil Works.